Case Study

continuous improvement

Find out how Bio-Chem Fluidics was able to reduce training times of new hires by over 80% (from three months down to two weeks) using Augmentir’s AI-powered augmented worker platform.

In this Case Study, you will learn how Bio-Chem Fluidics used Augmentir to:

  • Move from paper-based to interactive augmented instructions for assembly and QA procedures
  • Collect and provide insights on the granular assembly data required for their lean manufacturing initiatives and increasingly stringent regulatory requirements
  • Drive quality improvements through validation of critical assembly steps
  • Provide built in “training” for less experienced assemblers and temps
  • Reduce training time by over 80% (from three months down to two weeks)